Gutted

The last 2 screws to remove the switch and breaker assembly took 4 hours to get out. Someone had installed a plastic overlay and it was necessary to disconnect all the controls (carb heat, throttle, etc. to get it loose and access the screws). All that is coming out anyway so nothing lost.

Ella: 2 hours scraping draft excluder, cleaning and 2 more turning spanners and passing tools and equipment. Engineer in the making?!

Work Date: 5th August 2019
Hours: 6
Aircraft Section: Fuselage

Piano Keys